We casted our 4th floor today and reached the Top after almost a year of starting work. I am hitting my target date on 31st Dec 09 and want to see all that is possible being achieved by then.
Its really getting to speed up or to hold back time. On the domestic front i need the date to move faster that is going to land my wife in the safer zone for the new member to arrive. On the professional front how i pray i could hold back on time to see things materialize the way it was conceived. Whilst all around seem pretty ok with the speed however it leaves me a bit agonized to think on not hitting the date as promised.
Perhaps its best to let the time move at its pace. For all good that is in store , we humans just continue the journey with the good will and hard work , which is perhaps all that we have in hands.
Cheers. Look forward to a happy Christmas.
We formally brought in a Landscape Architect with good knowledge of Landscaping and Hardscaping. While at the face of it , it never looked like a tough nut to crack however professional approach and a planned layout is something that was very much required for doing up our central court. Whilst i am in the initial stages of understanding the whole thing but i feel impressed and contented with what he showed as the first cut.�