Very hot schedule today, stand by:
9:10 - turnstone shut down and memory pushed down to 1024mb.� pulled out lm-tools and installed gcc.� Must add VMWare tools and recompile.
- Kipper is going to get the LM-QA-Zodiac image up-to-speed and we'll spin a copy out to physical (wabasha if there is room)
- Check out turnstone with 1gb of ram and see if performance is still out of whack
- Build on towhee will continue today only.� That will get TOmcat up to speed, KIpper and I will get WAS up to speed today.
- Make decision today about which to use, Tomcat or WAS.� We could stick with the LM install of WAS, then do a stand-alone build in a few months.
----
- BTI meeting right now.
- Need to deploy servers.
- Witty Jim is working on the DB builds/installs.� He's dorking with DB2 now.
- Ratface wants 3 seperate servers stood up for this build.� They can be fresh 4 builds or fresh 5.2 builds.� They can be clones of genseed.� He doesn't care.� We just need fresh boxes with WAS 6.1 on them.
-� Will probably house with PFF.
10:30
-- Talked with Mr. T about this clusterfuck and have a few changes:
- BTI will house with PFF, but not only on the same ESX hosts, but on the same VM.� We need to share BTI, PFF, and K&K all on the same VM and same WAS instance.�
- Makes perfect sense to consolidate and use fewer WAS licenses
- Tosses a little more complication into the mix because I have 3 apps contending for the same resources.� (And the QA WAS install is fucko)
::
Slick is pulling the Zodiac image out of LM for deployment on Wabasha.
Once he finishes, he'll boot Zodiac up and let Kipper know.
2:15 - Turnstone re-deploy and re-conversion is complete.� Turned it over to Kipper to check out the WAS install with 5GB.
- Spoke with Mr. T. as 1-1 meeting.� Have meeting with AVP IceQueen tomorrow.
-- found out that smmsp user can't be deleted or sendmail won't run.� fixed that.� also fixed it in the RH5 gold image.